Before a contractor begins construction, they need to prepare a budget of estimates for approval by the owner. As the name shows, the values indicated in the construction estimate form are not accurate and are bound to change upwards or downwards in the course of construction. Here is a sample construction estimate form
Contractor company _________________________________________________________
Project: __________________________ Duration: From __________ to _________
Project Supervisor: ____________________________ Permit No. ___________________
Construction estimate form
Work type/Material Unit Quantity Unit Cost Total Cost
Clearing and Grubbing ________ ________ _________ __________
General Excavation ________ ________ _________ __________
Retaining Wall ________ ________ _________ __________
Conventional Segmental ________ ________ _________ __________
10 Inch Storm Sewer Pipe ________ ________ _________ __________
5 ft Depth ________ ________ _________ __________
Reconstruct Manholes ________ ________ _________ __________
Concrete Driveways ________ ________ _________ __________
Remove Fence ________ ________ _________ __________
12″ Trench Drain, channel ________ ________ _________ __________
Frame & grate ________ ________ _________ __________
Install Parking Sign ________ ________ _________ __________
Rip Rap Class 100 ________ ________ _________ __________
Misc ________ ________ _________ __________
Total Cost ___________________
Prepared by: ____________________________ Sign: ____________ Date: ____________
Approved By: ___________________________ Sign: ____________ Date ____________